Start Date Mar 8, 2013
Last Date Mar 31, 2018
Short Info
The Government has approved Re-structured Accelerated Power Development and Reforms Programme (R-APDRP) was approved as a Central Sector Scheme during XI Five Year Plan, which shall be taken-up in two parts: Part A and Part B. M/S Power Finance Corporation Limited to monitor and act as an implementing agency.
Detailed Info
Part A
Objectives:
• Preparation of Base-line data for the project area covering Consumer Indexing (shall be verified by an independent agency appointed by MoP).
• GIS Mapping
• Metering of Distribution Transformers and Feeders.
• Asset Mapping
• Adoption of IT applications for meter reading, billing & collection.
• Energy accounting and audit.
• MIS
• Redressal of consumer grievances.
• Establishment of IT enabled consumers service centers, etc.
A total of 13 eligible towns viz. Thoubal , Ningthoukhong , Bishnupur , Moreh , Nambol , Moirang , Kakching , Lilong (Thoubal) , Lilong (Imphal West) , Mayang Imphal , Laxmithongkhong Bazar , Samurou and Imphal in the state of Manipur are covered under R-APDRP Part A Scheme for which MoP through the Nodal agency (M/s Power Finance Corporation Ltd., New Delhi) had sanctioned the Project on 08-03-2010 (as 100% loan from the Government of India convertible to grant on achievement of targets set by MoP for reduction of AT&C loss). The project has been successfully completed during financial year 2016-17.
Part B
Objectives:
• Renovation and modernization and strengthening of 11 KV level Substation and Transformers/transformer Centers.
• Re-conductoring of lines at 11KV and below.
• Load Bifurcation.
• Feeder Separation.
• Load Balancing.
• HVDS (11KV)
• Aerial Bunched Conductoring in dense areas.
• Replacement of electromagnetic energy meters with tamper proof electronic meters.
• Installation of capacitor banks.
• Mobile Service Centers, etc.
• Strengthening of 33KV.
A total of 13 eligible towns viz. Thoubal , Ningthoukhong , Bishnupur , Moreh , Nambol , Moirang , Kakching , Lilong (Thoubal) , Lilong (Imphal West) , Mayang Imphal , Laxmithongkhong Bazar , Samurou and Imphal in the state of Manipur are covered under R-APDRP Part B Scheme for which MoP through the Nodal agency (M/s Power Finance Corporation Ltd., New Delhi) had sanctioned the Project on 08-03-2013. As per the funding mechanism 90% funds for the project are provided as loan by GoI (Manipur being a Special Category State) and remaining 10% as Counterpart funding loan from M/S Rural Electrification Limited (Financial Institution). The GoI loan (90%) are convertible to grant on achievement of targets set by MoP for reduction of AT&C loss. The project has been successfully completed during financial year 2017-18.